Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5417

Retain CSM level after HMC Kernel update

When CSM is upgraded outside of a Remote Code Load (RCL) using the stand alone DSCLI and an RCL occurs afterwards where the HMC kernel is updated, CSM is back-leveled to the version that is included in the microcode bundle. This forces the User/Ad...
about 2 years ago in IBM Copy Services Manager (CSM) 4 Not under consideration

Password and Certificate expiration warning

Providing a warning starting at 30 days out and decrementing by week until the last week, then daily, would alert Users in advance of expiration.
about 2 years ago in IBM Copy Services Manager (CSM) 2 Under review

CNSA Support for Per-PV Encryption

Add support for Scale CNSA to provide per-PV encryption allowing for each PV to use its own encryption key from GKLM or HashiCorp Vault. This would be configured as part of the encryption config CR for the PVC. Allow for each fileset associated wi...
5 months ago in Storage Scale (formerly known as GPFS) 1 Future consideration

Suppression of ro BR token when reading at RO mode

A BR token is used to keep cache coherency of data across nodes. We experienced that 'ro BR' token is requested by each node even other nodes read the same rage of data at the same time. Unless the range is never changed by all nodes, getting of r...
over 2 years ago in Storage Scale (formerly known as GPFS) 0 Not under consideration

IBM Spectrum Control - Alerts - Ability to Schedule Non-triggering Time Windows

Customers have backup windows during which a lot of alerts are triggered. Too many alerts causes customers to ignore all the alerts altogether even those that are triggerred during normal business hours. It would be great if we had the capability ...
almost 8 years ago in IBM Spectrum Control 2 Future consideration

Staged severity level for software code level warnings

In the Advisor section you get hints when your code is below minimum level. It's even called a software warning. We propose to raise it as alert, when on an EOS code version, as wraning when you are below minimum level and as informational when yo...
8 months ago in IBM Storage Insights 0 Future consideration

Possibility to choose which events are send to external sylsog server /CLI command enhancement

At the moment, we can send logs to an external server. It contains some information as listed in the manual - https://www.ibm.com/docs/en/ds8900/9.3.3?topic=configuring-syslog-server. I would like to be able to select which events need to be sent ...
4 months ago in IBM DS8000 0 Under review

Spectrum Virtualize "IO pause" on node leave and join is entirely too long

When a node leaves or joins a Spectrum Virtualize cluster (SVC, V7K, FS9100, etc), the cluster imposes an "IO pause" on the order of 10 or more seconds. This is unacceptably long, especially in a flash environment.
over 5 years ago in IBM Spectrum Virtualize / FlashSystem 1 Planned for future release

Easy change certificate on S3 storage agent

Today the S3 Agent certifikate is catched from the default certifikation on sp server at the the installation of s3 agent. It's not possible to add a new certifikate to the s3 agent certificate store. To change the certificate you must deinstall t...
about 2 years ago in Storage Protect Family / Spectrum Protect (Server) 1 Future consideration

Install ICS through Customer-Code-Load

This is an enhancement request of Customer-Code-Load of DS8000 R9.3 and later. My understanding is that currently there is no way to choose an ICS through Customer-Code-Load GUI. (If there is a higher level of bundle, some ICSs are selected aut...
11 months ago in IBM DS8000 0 Planned for future release