Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Copy Services Manager (CSM)

Showing 120 of 5206

Related to SafeGuarded Copy on the DS8000. SGC backup copies CANNOT be deleted. Today, a person with adminstrator rights can still log on and delete off valid SGC backup copies. Customers have been asking for this capability to be removed.

This feature is required to ensure that SGC is totally immutable.
about 1 month ago in IBM Copy Services Manager (CSM) 2 Functionality already exists

Add back the small RPO graph on the Global Mirror Info tab

It seems the small RPO chart which used to be on the Global Mirror Info tab was removed in 6.3.8 although doesn't appear to have been publicized in the release notes. This was a very convenient immediate place to check recent RPO. Having to use th...
17 days ago in IBM Copy Services Manager (CSM) 0 Future consideration

Enhanced CSM Notification with priority and persistence functionality

Adding the ability to make an alert persistent by selection would allow for some level of prioritization for critical type alerts versus non critical or informational type alerts. Currently the alerts are one shot. The alerts are not redriven at a...
about 1 month ago in IBM Copy Services Manager (CSM) 0 Future consideration

Add certificate JKS synchronizing between Primary and Standby Servers

Our INSOSEC department does not allow any self-signed certificates in our environment. All certificates must be CA-Signed. We currently run our Primary CSM on z/OS to make it simple to manage Hyperswap sessions. We run our Standby Servers on HMC s...
18 days ago in IBM Copy Services Manager (CSM) 0 Future consideration

Improve zOS host IP connection loss detection and failover behavior

There have been incidents in the field showing the current design of CSM z/OS host IP connection loss detection and failover to redundant active host connection is significantly delayed to 15-20 minutes. This may happen especially when the connect...
9 months ago in IBM Copy Services Manager (CSM) 2 Future consideration

Allow different size volumes at target in a Flashcopy session or Make Migration session to same DS8K.

This will allow move disks to bigger sizes on same DS8K. I was using CSM to disk migration but when I tried to run on same DS8K I got an error. So, I have to run the FCESTABL on zOS, which worked perfectly with different sizes at target. The benef...
8 months ago in IBM Copy Services Manager (CSM) 1 Future consideration

Allow full Box or multiple Subsystem selections in ESE and SGC Sizer sessions

When ESEsizer or SGCsizer sessions are configured, typically they are configured for a large amount of LSS/LCUs if not even for all volumes configured on the system. However, the Copy Set selection wizard does not allow to proceed, when only a sys...
2 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

CSM Primary to automatically reconnect to the standby server after the standby CSM task is recycled or vice/versa Standby reconnects automatically to Primary

Every time one of our CSM started tasks is recycled or if an lpar is IPL'd when the CSM started task comes back up it does NOT reconnect to either the standby or the primray (depending on which CSM task that was shutdow/restarted. The ability of t...
17 days ago in IBM Copy Services Manager (CSM) 1 Future consideration

Check and Remove existing IR bitmap when Preparing for Secondary Migration to avoid full copy during resync to new secondary

The CSM secondary migration feature uses the IR bitmap on the primary system to perform an incremental resync to a new secondary system. Actually, when CSM perform the Prepare for Secondary Migration step, it will request the DS8000 to set the IR ...
4 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Accuracy of Spectrum control summary overall storage usage , it didnt show sum up virtual capacity of SGC volumes

Spectrum Control is not accurate enought. DS8K business today is very often using the SGC Backup as majors tactics to protect against cyber threats. Would be very very valuable to have this storage capacity easy to be followed up from a simple GUI...
about 1 month ago in IBM Copy Services Manager (CSM) 0 Future consideration