Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Copy Services Manager (CSM)

Showing 135 of 5549

Add certificate JKS synchronizing between Primary and Standby Servers

Our INSOSEC department does not allow any self-signed certificates in our environment. All certificates must be CA-Signed. We currently run our Primary CSM on z/OS to make it simple to manage Hyperswap sessions. We run our Standby Servers on HMC s...
10 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Related to SafeGuarded Copy on the DS8000. SGC backup copies CANNOT be deleted. Today, a person with adminstrator rights can still log on and delete off valid SGC backup copies. Customers have been asking for this capability to be removed.

This feature is required to ensure that SGC is totally immutable.
10 months ago in IBM Copy Services Manager (CSM) 2 Functionality already exists

Add GM capability between sites 1&2 and 3&4 to 4 site replication enhanced solution

Currently the 4 site replication enhanced solution allows a client to switch from MM to GC between sites 1&2 or between sites 3&4. Typically this functionality would be used if the MM replication was causing a significant temporary product...
10 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Enhanced CSM Notification with priority and persistence functionality

Adding the ability to make an alert persistent by selection would allow for some level of prioritization for critical type alerts versus non critical or informational type alerts. Currently the alerts are one shot. The alerts are not redriven at a...
10 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Accuracy of Spectrum control summary overall storage usage , it didnt show sum up virtual capacity of SGC volumes

Spectrum Control is not accurate enought. DS8K business today is very often using the SGC Backup as majors tactics to protect against cyber threats. Would be very very valuable to have this storage capacity easy to be followed up from a simple GUI...
11 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Disable E-mail (and other) notifications temporarily

We are using a Notification alerting on CSM and it works well, however we would like to have a possibility of temporarily suppressing it when one does planned activity like increasing volume size (it requires breaking the mirroring, removing copy ...
12 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Adding Support for Multi Target PPRC in CSM for Hitachi VSP5000 Systems

We use in our Datacenter for migration last year multi target concept to migrate our old vsp to new one and use Hittachi TrueCopy and CSM to do that. We see that also Multitarget PPRC are working as expectetd but we missed the complete support of ...
12 months ago in IBM Copy Services Manager (CSM) 1 Not under consideration

Provide more details for Mail alert notifications for messages such as, IWNR1963W One or more logical paths between storage systems have entered an error state or have been removed.

These alert notifications did not have any information regarding what paths and for which storage subsystems were affected during the path loss. When the CSM console logs were checked there were also no messages for this event and all paths were g...
12 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Add the Persisent option for the practice FC (H3-I3 role pair) in CSM session.

The MM-GM with practice session is missing the Persistent option for the H3-I3 FC role pair (I suppose the other session with practice are missing the option too). This is useful if H3 volumes are space efficient, the FC relation should be persist...
about 1 year ago in IBM Copy Services Manager (CSM) 1 Needs more information

Check and Remove existing IR bitmap when Preparing for Secondary Migration to avoid full copy during resync to new secondary

The CSM secondary migration feature uses the IR bitmap on the primary system to perform an incremental resync to a new secondary system. Actually, when CSM perform the Prepare for Secondary Migration step, it will request the DS8000 to set the IR ...
about 1 year ago in IBM Copy Services Manager (CSM) 0 Future consideration