Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5473

Staged severity level for software code level warnings

In the Advisor section you get hints when your code is below minimum level. It's even called a software warning. We propose to raise it as alert, when on an EOS code version, as wraning when you are below minimum level and as informational when yo...
10 months ago in IBM Storage Insights 0 Future consideration

Improved LDAP support for Security Administrator users in DS8000

If you want to use the Export/Import LDAP Remote Authentication configuration option, and you have at least one Security Administrator (SA) user defined, when you Import the existing configuration in a new DS8000, the SA user is not imported becau...
11 months ago in IBM DS8000 0 Planned for future release

Capability to throttle vdisk by defining a goal response time (possibility to delay an I/O to a value)

There are an increasing number of clients asking for the functionality of specifying the goal response time of a volume (vdisk), so that it doesn't go faster than this goal and does not use resources that could be used by other volumes.
about 5 years ago in IBM Spectrum Virtualize / FlashSystem 0 Future consideration

SnapMirror 2 Tape NetApp - Restore Data to a different NetApp (CASE: TS013360935)

SnapMirror 2 Tape NetApp - Restore Data to a different NetApp (CASE: TS013360935)
about 1 year ago in Storage Protect Family / Spectrum Protect (Server) 0 Under review

ESS should be able to notify customers if there is filesystem corruption (currently they can't in their default configuration).

There is NOTHING worse than undetected filesystem corruption in a storage system. But, as shipped to customers, all ESS storage systems will NOT notify you if there is filesystem corruption. They can _detect_ it, but they can't notify the customer...
10 months ago in Storage Scale System 0 Future consideration

IBM Spectrum IBM Spectrum Protect Replication to 3rd SP Server and/or Public Cloud Storage

We can currently only replicate a node's data to only 1 IBM Spectrum Protect server. Various customers now have a requirement to replicate to a 3rd site or to the cloud.
about 7 years ago in Storage Protect Family / Product functionality 6 Not under consideration

Buffered log design Enhancement to take advantage of the 65 GB virtual volumes

The majority of TS7700 customers are using in the Data Class setting for Virtual Volume Sizes the default 3490 Counters Handling of “Surface EOT”.There are various reasons why a customer does not want to switch to “Wrap Supported” e.g., they back-...
6 months ago in Tape - High End Virtualization 2 Not under consideration

Check and Remove existing IR bitmap when Preparing for Secondary Migration to avoid full copy during resync to new secondary

The CSM secondary migration feature uses the IR bitmap on the primary system to perform an incremental resync to a new secondary system. Actually, when CSM perform the Prepare for Secondary Migration step, it will request the DS8000 to set the IR ...
11 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Add sender email address to Alert Notifications screen

Currently the CSM GUI configuration for Alert Notifications asks for the "Reply-to-address". This is not the same as the sender address but this subtle difference is easily missed (and if noticed there is no obvious way to specify the sender addre...
about 1 month ago in IBM Copy Services Manager (CSM) 3 Future consideration

Support for vCloud Director

We have several MSP partners who are installing vCloud director and who are using or plan to use SPP. VMware has published the following document regarding vCloud Backup:Backup Design for vCloud Tenant vAppshttps://www.vmware.com/content/dam/digit...
about 6 years ago in Storage Protect Family / IBM Spectrum Protect Plus 5 Future consideration