Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Spectrum Virtualize / FlashSystem

Showing 691

PDU Power Cord for 92F too short for CMA

The two 2.8m PDU power cords for the 92F high density expansion are too short for the cable management arm it is supplied with. The power cords avialable for the 92F in econfig should be longer to allow the cable management arm to be extended, con...
over 6 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

Save failed commands ran on cluster to be viewed in audit logs with output in Blue Diamond

* SME Martin Dzhagarov suggested this , so creating this RFE * - Where were supposed to look for failed commands.This is Blue Diamond and I don't think that it show up in the audit log- Failed commands do not show up in the Audit log. Can the cust...
almost 3 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Remote Support Disconnect button

In the Support Assistance screen on FlashSystem our customer would like to have a disconnect button. We understand we can do this with the command line but the customer feels a button to disconnect in the GUI would be more helpful. On a call with ...
almost 3 years ago in IBM Spectrum Virtualize / FlashSystem 0 Future consideration

If there is a broken or offline canister, make it easier for the offline canister to rejoin the good canister after the offline canister is replaced

Customer had a canister that was replaced. The new canister would not boot. Support had to work with the admin to run the chbootdrive command to update the serial number to the new canister to get things fully working. The request is for an enhanc...
12 months ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Error/warning on degraded hosts

Currently when a host is in degraded state, the events are not showing any warning or error. Hence there is a chance that these degraded hosts goes unnoticed. So I suggest to have a warning/error to be reported in the events for any host went into...
almost 2 years ago in IBM Spectrum Virtualize / FlashSystem 1 Future consideration

Event log enhancements

Enhanced monitor of internal process and better detail on issues. Lack of reporting on critical internal components hinders determination of issues and recovery.
almost 7 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

SVC - Cron Backup control over scheduling

SVC Cron backup runs at the same time but collides with other workload processes. Would like to be able to update the backup to a better time frame within out envrionment to reduce impact and ensure backup failures do not occur as we have seem
almost 7 years ago in IBM Spectrum Virtualize / FlashSystem 1 Planned for future release

One hot-spare node for multiple SVC clusters

Some of the customers have multiple SVC clusters, but all the nodes are located at the same two sites. It would be a great enhancement if the hot-spare node would not be bound to one specific cluster but could be bound to multiple clusters. With t...
about 7 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

Display information about encryption technology used in GUI & CLI encryption command

Display information about encryption technology used in GUI & in CLI encryption command - which will help customer's cybersecurity team - requested by customer. Check this thread in slack # specv-sme-se = https://ibm-systems-storage.slack.com/...
about 1 year ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Allow to expand the size of volumes in a Flashcopy mapping

Currently it is not allowed to expand the size of a volume which is part of a flashcopy mapping. This restriction should be removed.
about 6 years ago in IBM Spectrum Virtualize / FlashSystem 3 Not under consideration