Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Copy Services Manager (CSM)

Related to SafeGuarded Copy on the DS8000. SGC backup copies CANNOT be deleted. Today, a person with adminstrator rights can still log on and delete off valid SGC backup copies. Customers have been asking for this capability to be removed.

This feature is required to ensure that SGC is totally immutable.
over 2 years ago in IBM Copy Services Manager (CSM) 2 Functionality already exists

Add a SYSLOG option for console logs

In addition to having the option to view the console logs in the user interface add an option to offload to a syslog server similar to hardware platforms (DS8, VTS, etc).
over 1 year ago in IBM Copy Services Manager (CSM) 2 Future consideration

Query for bitmap increment status

During a configuration change from H3->H1->H2 to H1->H2->H3, running the start H1->H2->H3 command may result in an unexpected full copy from H2 to H3 instead of a quick resync (for example, when z/OS systems were down after rolli...
over 1 year ago in IBM Copy Services Manager (CSM) 2 Submitted

Use RACF certificates for all services instead of file based keystores

Since release 6.3.15 it is possible to use one certificate for all CSM services. One can use either RACF keyrings or file based keystores, however when one wants to set up active/standby configuration, one must use keystore. I would like to keep u...
3 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

add affected storage system / path for the message IWNR1963W

The message IWNR1963W is: One or more logical paths between storage systems have entered an error state or have been removed. Sometime there are micro network issue that makes the path have a punctual error. As we have several storage system in ou...
over 1 year ago in IBM Copy Services Manager (CSM) 0 Future consideration

Improve CSMCLI scripting by enabling an echo and echoprefix

In DSCLI, you can define echo on/off and you can set an echoprefix. In CSMCLI, this is still not available. When running CSMCLI in script mode, you see in the output dataset only the command response, but not command itself and you see only the IP...
over 1 year ago in IBM Copy Services Manager (CSM) 0 Future consideration

Add scheduled task progress and concatenation visibility

With CSM 6.3.17, there is no easy capability yet in the task overview, to recognize which tasks are concatenated and how they are concatenation to get an idea about the overall task flow. Furthermore, there is no indication which task is being exe...
3 months ago in IBM Copy Services Manager (CSM) 1 Future consideration

Scheduled Task action type improvements

Use case: Proper automation of SGC backups in a MT topology. Backups are automated on Site 3, using GM secondaries H3 as SGC source. The automation should ensure to create backups, but prevent the DR RPO remains impacted if the backup task fails i...
3 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Storage Nickname Column in the Storage Panel for DS8000

For larger clients that have numerous DS8000s (or for any storage systems, I guess), it would be very helpful if CSM users could specify a customizable "nickname" for each DS8000 which would show up as another column in the storage panel. It would...
7 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Prevent TERMINATE of practice disks if a volume is online

In a session with practice disks, can you add an option to prevent TERMINATE if at least one of the practice disks is online please ?
over 1 year ago in IBM Copy Services Manager (CSM) 0 Future consideration