Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Copy Services Manager (CSM)

Showing 129 of 5518

CSM for z/OS - Active/Standby on different storage systems

We installed the standby CSM server on remote site on a different sysplex with different storage systems. All storage connections from the active CSM were synchronized to the standby CSM server. But the standby CSM server has no access to the stor...
over 5 years ago in IBM Copy Services Manager (CSM) 1 Future consideration

Adding role to resync Management Servers

We installed active and standby CSM server on z/OS. If one system IPLed, we implemented automation scripts that automatically resync the Management Servers after the CSM is started. With this Automation, we are able to IPL the system without the n...
over 5 years ago in IBM Copy Services Manager (CSM) 0 Future consideration

Have the ability do define a cut-off date and time for scheduled operation

Have the ability do define a cut-off date and time for scheduled operation expecially when it is expected to run at a predefined date/time. If for any reason the CSM server is stopped when a timer for a scheduled action expires, the action will be...
over 2 years ago in IBM Copy Services Manager (CSM) 4 Future consideration

CSM Console Messages Need to Show Correct Pair Direction

CSM log messages always show for example "Starting all pairs in role pair H1-H2" even if the start command was issued for H2-H1 instead. This can be very confusing and misleading when trying to check back and see what commands were issued and what...
almost 7 years ago in IBM Copy Services Manager (CSM) 1 Future consideration

improvements of the RC handling in the CSMCLI framework

For automation it would be easier if a validation of the return code is sufficient for successful CSMCLI command execution.Any Messages not equal Info Messages should result in a RC <> 0
almost 6 years ago in IBM Copy Services Manager (CSM) 1 Future consideration

Copy Services Manager - Need active/active or autofailover when HMC connection fails

During a storage migration the Copy Services Manager server lost communication with the DS8886 HMC. The replication status and control was unavailable until the HMC was rebooted. CSM should use both HMCs of the DS8886 and not have a single point o...
almost 6 years ago in IBM Copy Services Manager (CSM) 0 Future consideration

Ability to run initckdvol as it is often needed during DASD refresh

During DASD refreshes, we perform multiple times full data push to the new frames so that the application teams can do as much testing on the new frames. And IBM recommends us to run initckdvol before we do a new full push to the new frame since t...
over 4 years ago in IBM Copy Services Manager (CSM) 1 Future consideration

GMCV with Practice session

CSM currently has GM with Practice session and would like to have GMCV with Practice session added. We would use this for our DR tests and for specific application testing scenarios.
over 4 years ago in IBM Copy Services Manager (CSM) 0 Future consideration

ELB not managed by TPC/R

For an effective and convenient management of a DS8000 replication environment, it would be very useful if TPC-R could manage ELB timeout for every LCU/LSS in a MM/MGM environment. In fact, a clear display of this parameter for the session (e.g. t...
over 11 years ago in IBM Copy Services Manager (CSM) 2 Future consideration

For V7000 and SVC create an automated report for the status of Global Mirror sessions

Create a global mirroring report providing the status of V7000 and SVC Global mirroring that can be automatically run daily and sent via email to end users. Should contain the following (at a minimum)CG_Name Active Connnected CurrentDate/Time Last...
over 6 years ago in IBM Copy Services Manager (CSM) 0 Future consideration