Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 1076

Replication data communication encryption in transit using TLS

Encryption of data at flight: Currently our spectrum Virtualize software is able to do a encryption of data at rest. This capability means that data is encrypted as it is written to disks by the IBM Spectrum Virtualize Controllers, and not by disk...
over 4 years ago in IBM Spectrum Virtualize / FlashSystem 1 Delivered

Dynamic volume expansion for HyperSwap volumes

We urgently need the support for dynamic volume expansion at HyperSwap volumes. Currently one HyperSwap volume copy needs to be removed to enable the volume expansion and afterwards to be re-created &re-synchronized again to do this. This resu...
over 7 years ago in IBM Spectrum Virtualize / FlashSystem 3 Delivered

Change to CIM support

On version 8.6.1 and newer, support for the CIM protocol is removed. Some third party applications that connect using the CIM protocol will need to be updated.
about 1 year ago in IBM Spectrum Virtualize / FlashSystem 6 Delivered

Cloud based quorum

For SVC stretched clusters more flexibility is required. Currently only a expensive fibre channel solution can be used as a quorum system in the 3rd location.
almost 11 years ago in IBM Spectrum Virtualize / FlashSystem 3 Delivered

Enhanced VM excludes for TSM for VE

Enhancement to TSM for VE set up to allow an include/exclude file for selective exclusion / inclusion of VMs from backup (similar to BAClient model).
almost 10 years ago in Storage Protect Family / Spectrum Protect for Virtual Environments 6 Delivered

Storwize - simplify flashcopy restoration process

Currently in the event of restoring a volume using a flashcopy it is required for a reverse flashcopy to be created and then the new mapping to be started with the -restore flag. This requires a degree of understanding of how the technology that i...
over 6 years ago in IBM Spectrum Virtualize / FlashSystem 4 Delivered

VTS Physlib enhancement - TS7760T

For library maintenance operations, the TS7770T has to be put in Service Prep mode. Hence during all operations even planned ones, this cluster is unavailable.From ATS: unfortunately the Physlib is not designed for "planned outages". See the Host ...
about 6 years ago in Tape - High End Virtualization 2 Delivered

Ability to schedule maintenance policy

Allow user to modify the time at which the maintenance policy will be started. An acceptable workaround would be to change the start time via a REST API call.
about 6 years ago in Storage Protect Family / IBM Spectrum Protect Plus 1 Delivered

Add decomission node command to TSM

An ability to put a node into 'decomissioned' mode, so that it can locked and cannot perform any more backups but is still available for restore. At the same time the node data can be scheduled for deletion after a period of days that is compliant...
over 13 years ago in Storage Protect Family / Spectrum Protect (Server) 11 Delivered

IP Replication partnerships limit more than 1

We have the following limit in IP Replication: Only a single partnership over IP is supported (page 412 on redbook sg247938 Implementing the IBM Storwize V7.4). Several customers are demanding when it will be increased to 3 like in FC Replication
over 9 years ago in IBM Spectrum Virtualize / FlashSystem 4 Delivered