Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 1538

lowering the permissions to view access logs

User permission role set to "VIEW LOG" will to give user access to all LOGS.It will not be able to see "FAILED LOGIN". Only SUPERUSER can see this type of entries. That permissions are to height to check logs only, especially in third party script...
about 1 month ago in Storage Protect Family / IBM Spectrum Protect Plus 1 Future consideration

Display grace period of 30 minutes between 2 log collections in task failure message

When attempting to collect logs from a storage subsystem, a user can received the following message when the task fails: " Uploading system logs for system XXX to ticket TS0123456789. The log package for the device with serial number YYY for ticke...
about 1 month ago in IBM Storage Insights 0 Future consideration

Support Scale Client running on VMware ESXi 8.x

According to the support page, VMware ESX 7.x is supoorted but not ESXi8.x . Table 72. VMware support matrix on VM guest https://www.ibm.com/docs/en/STXKQY/gpfsclustersfaq.html#virtual also please provide GDS(GPUDirect Storage ) support informatio...
about 2 months ago in Storage Scale (formerly known as GPFS) 0 Future consideration

Add back the small RPO graph on the Global Mirror Info tab

It seems the small RPO chart which used to be on the Global Mirror Info tab was removed in 6.3.8 although doesn't appear to have been publicized in the release notes. This was a very convenient immediate place to check recent RPO. Having to use th...
about 2 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

CSM Primary to automatically reconnect to the standby server after the standby CSM task is recycled or vice/versa Standby reconnects automatically to Primary

Every time one of our CSM started tasks is recycled or if an lpar is IPL'd when the CSM started task comes back up it does NOT reconnect to either the standby or the primray (depending on which CSM task that was shutdow/restarted. The ability of t...
about 2 months ago in IBM Copy Services Manager (CSM) 1 Future consideration

Add certificate JKS synchronizing between Primary and Standby Servers

Our INSOSEC department does not allow any self-signed certificates in our environment. All certificates must be CA-Signed. We currently run our Primary CSM on z/OS to make it simple to manage Hyperswap sessions. We run our Standby Servers on HMC s...
about 2 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Support for dynamic expansion of each constituent volume in Storage Scale GPFS's File System, especially in combination with Db2 PureScale on Public Cloud.

It is necessary to support dynamic expansion of each constituent volume itself, rather than GPFS expansion by adding volumes. Adding volumes has a limit on the number of expansions. The method of adding a volume larger than the existing volume an...
about 2 months ago in Storage Scale (formerly known as GPFS) 0 Future consideration

Preventive alert for cluster key certificate expiration

According to the recent flash " IBM Storage Scale: An expired cluster key prevents nodes from connecting to the Storage Scale cluster resulting in admin commands failing to update the cluster configuration.https://www.ibm.com/support/pages/node/71...
about 2 months ago in Storage Scale (formerly known as GPFS) 0 Future consideration

Add GM capability between sites 1&2 and 3&4 to 4 site replication enhanced solution

Currently the 4 site replication enhanced solution allows a client to switch from MM to GC between sites 1&2 or between sites 3&4. Typically this functionality would be used if the MM replication was causing a significant temporary product...
2 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Accelerate re-balance actions when adding new ECE nodes into existing RG

Partner was opened two cases about expanding ECE nodes to existing RG. The re-balance progress was very slowly. The action was last for 3 months when adding 3 new ECE nodes into existing 5 ECE nodes topology.This is not a acceptable solution to cu...
2 months ago in Storage Scale (formerly known as GPFS) 0 Future consideration