Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Spectrum Control

Showing 57 of 5224

SRA agent should support "status" for HBAs

Right now the SRA (Storage Resource Agent) does not support a status for SAN HBAs.It should display a useful status for every HBA - preferably even every port on the HBA.Possible states: Online/Offline/Link-Up/Link-Down, etc.This should exist for ...
over 2 years ago in IBM Spectrum Control 0 Under review

Spectrum Control with DFSMS Storage Group Awareness

Request for Thin Provisioning Monitoring Interface that can report based on DFSMS (Storage Group). Please refer to RFE 137862 for additional detail.
almost 4 years ago in IBM Spectrum Control 0 Future consideration

Data Manager reports should recognize GPFS & VMFS as a cluster

The report Data Manager > Reporting > TPC-wide Storage Space > File System Space > By cluster does not show GPFS clusters or VMware ESX clusters as a cluster. They are shown under By Computer. As a result, the file space in /VMFS (ESX ...
about 13 years ago in IBM Spectrum Control 3 Future consideration

Request to develop VSC ability to blacklist SVC ports when automatic zoning. Prevent usage of SVC internode ports.

VSC is not able to restrict zoning for SVC ports dedicated for internode communication.The reason of this request is to ask IBM to develop some blacklist option for VSC automatic zoning in order to block the use of some selected SVC ports.
over 6 years ago in IBM Spectrum Control 2 Not under consideration

Add maxdrain option to GM initial setup

Modify TPC-R GUI to set a desired GM drain time (maxdrain) value during initial session setup and allow for the value to be changed during Start H1-H2, you already allow the cginterval to be changed. Currently CSMCLI is the only way to change this...
about 9 years ago in IBM Spectrum Control 2 Planned for future release

Allow grouping of statistics by DS8000 internal resources for performance reporting

Provide the ability to group and subset performance statistics for the DS8000 based on the internal configuration of the disk subsystem. Metrics which could be used for grouping and subsetting would be: - Rank statistics : device adapter, tier, DD...
over 10 years ago in IBM Spectrum Control 1 Future consideration

remote awareness of TPC-R sessions

When a storage device needs to be deleted from the standby server, the standby needs to be made active, and the device deleted, then returned to the standby state. The additional steps places risk on the TPC-R database. The standby database should...
about 11 years ago in IBM Spectrum Control 1 Future consideration