Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Copy Services Manager (CSM)

Showing 148 of 5791

CSM Server restart & ESSNI restart confirmation in CSM

Following a CSM Server restart, or ESSNI restart through the hardware management console, there should be an indication/event in the logs that that happened. Currently, there is no way to verify within CSM, that a restart of either of these compon...
4 months ago in IBM Copy Services Manager (CSM) 1 Not under consideration

Retain CSM level after HMC Kernel update

When CSM is upgraded outside of a Remote Code Load (RCL) using the stand alone DSCLI and an RCL occurs afterwards where the HMC kernel is updated, CSM is back-leveled to the version that is included in the microcode bundle. This forces the User/Ad...
almost 3 years ago in IBM Copy Services Manager (CSM) 4 Not under consideration

Improve the CSM behaviour to find free session IDs on the hardware

At the moment CSM only checks the GM masters running on the Ds8000 and their state. It is not checked which LSS sessions are configured but are not members of a running Global Mirror. In situations where the DS8k hardware is managed by different t...
about 1 year ago in IBM Copy Services Manager (CSM) 1 Not under consideration

Enhanced CSM Notification with priority and persistence functionality

Adding the ability to make an alert persistent by selection would allow for some level of prioritization for critical type alerts versus non critical or informational type alerts. Currently the alerts are one shot. The alerts are not redriven at a...
over 1 year ago in IBM Copy Services Manager (CSM) 0 Future consideration

Provide SMTP Authentication capability to CSM (Copy Services Manager)

I work at a financial institution and our Security Department has recently implemented a policy to block all unauthenticated SMTP which, of course, is affecting alerts via email from CSM. This forced us to utilized SNMP for alerting...which isn’t ...
5 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

Add roll-up snapshot/SGC Schedule

Allow the user to have an aggressive snapshot interval that rolls up to a less aggressive, longer retention snaps.
10 months ago in IBM Copy Services Manager (CSM) 1 Future consideration

Support for the recognition of cascaded FlashCopy volumes

If a target volume of an existing FlashCopy relationship is used with FCM as source volumes (Cascaded FlashCopy), the FlashCopy relationship is established, but is not displayed in the report as an existing FlashCopy relationship. Even a Verfiy wi...
6 months ago in IBM Copy Services Manager (CSM) 0 Future consideration

z/OS HyperSwap and Concurrent Copy

After a HyperSwap, the command "Start H2->H1" (Start H1->H2 respectively) will fail if there a active Concurrent Copy Sessions on secondaries (former primaries). CSM will show error IWNR2108E RC 0F13. We know IBM recommends to eliminate any ...
over 5 years ago in IBM Copy Services Manager (CSM) 1 Future consideration

Improve the Logical Path Change alert to be more specific.

Currently, when a connection is temporarily dropped, we receive an email alert (like the one shown below) to notify us that a path has gone down. In the DS8K log, we can see when the path goes down, & when comes back up, but the alerts show th...
about 1 year ago in IBM Copy Services Manager (CSM) 0 Future consideration

Check and Remove existing IR bitmap when Preparing for Secondary Migration to avoid full copy during resync to new secondary

The CSM secondary migration feature uses the IR bitmap on the primary system to perform an incremental resync to a new secondary system. Actually, when CSM perform the Prepare for Secondary Migration step, it will request the DS8000 to set the IR ...
over 1 year ago in IBM Copy Services Manager (CSM) 0 Future consideration