Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Spectrum Virtualize / FlashSystem

Showing 696

V7000 QOS function to prioritize workload

The V7000 QOS function (I/O Governing) can limit the I/O's on a LUN. We need a functionality as I/O Priority Manager on DS8870 that can prioritize the I/O's on a LUN. Can we get this kind of function on the V7000?
over 9 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

Consistent VDisk copy protection during ESC Incremental Resynch and/or Volume Migration

During volume migration and volume copy incremental synchronization in stretch cluster configurations, until the second copy is consistent again, the loss of the primary site will command restoring data from tape backup into the second site capaci...
over 7 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Improved reporting to support daily operations

Customers have requested a better way to report and manage space within a pool. The example given was:It is very difficult to work out how much space a snapshot or a series of snapshots are consuming in a pool with IBM storage, other vendors make ...
almost 4 years ago in IBM Spectrum Virtualize / FlashSystem 3 Future consideration

Allow user to append a comment svctask commands

This is to allow user to optional add a comment to svctask command in order to provide an indication or refer to a change number when making changes to Spectrum Virtualise.This would also be captured in the audit log.
over 8 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

PDU Power Cord for 92F too short for CMA

The two 2.8m PDU power cords for the 92F high density expansion are too short for the cable management arm it is supplied with. The power cords avialable for the 92F in econfig should be longer to allow the cable management arm to be extended, con...
over 6 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

Spectrum Virtualize VSS provider has to support Hyperswap configurations

There are currently limitations in the VSS HW provider used with IBM Flashsystem 9100 in Hyperswap configuration. This prevents Spectrum Protect Snapshot from supporting these configurations.
almost 5 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Save failed commands ran on cluster to be viewed in audit logs with output in Blue Diamond

* SME Martin Dzhagarov suggested this , so creating this RFE * - Where were supposed to look for failed commands.This is Blue Diamond and I don't think that it show up in the audit log- Failed commands do not show up in the Audit log. Can the cust...
almost 3 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Remote Support Disconnect button

In the Support Assistance screen on FlashSystem our customer would like to have a disconnect button. We understand we can do this with the command line but the customer feels a button to disconnect in the GUI would be more helpful. On a call with ...
almost 3 years ago in IBM Spectrum Virtualize / FlashSystem 0 Future consideration

Event log enhancements

Enhanced monitor of internal process and better detail on issues. Lack of reporting on critical internal components hinders determination of issues and recovery.
about 7 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

SVC - Cron Backup control over scheduling

SVC Cron backup runs at the same time but collides with other workload processes. Would like to be able to update the backup to a better time frame within out envrionment to reduce impact and ensure backup failures do not occur as we have seem
about 7 years ago in IBM Spectrum Virtualize / FlashSystem 1 Planned for future release