Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5455 of 5455

IP Quorum message when deamon stoppes running or VM is down.

After setup IP quorum in a Stretched cluster environment there is no warning\error or message when the VM is down or deamon stopped running. So a message or event is needed to take action to start the IP quorum again.
over 8 years ago in IBM Spectrum Virtualize / FlashSystem 0 Future consideration

When Safeguarded Copy is out of capacity, allow for either oldest to delete or newest to not be created

Give Safeguarded Copy customers a choice to either not create a new copy, or delete the oldest copy when SGC capacity is not sufficient to create a new copy
about 2 years ago in IBM Copy Services Manager (CSM) 1 Future consideration

Rebuild used extents with DRAID

The current design in DRAID is rebuild all of exents,even most of extents don't have real data.Customer hope to DRAID can support optimize mode that only rebuild used space.With optimize mode, rebuild time can be shortened significantly. This is v...
almost 5 years ago in IBM Spectrum Virtualize / FlashSystem 2 Future consideration

Need to sort VSNAP by name or by site in SPP GUI

We have more than 60 VSNAPs and we need to sort them by name or by site
about 2 years ago in Storage Protect Family / IBM Spectrum Protect Plus 1 Future consideration

Cloudtype S3 IA

Support for off-premise cloud container pool cloudtype for AWS S3 IA storage. Currently the only option is for S3.AWS offers S3 IA as an additional storage option - https://aws.amazon.com/blogs/aws/aws-storage-update-new-lower-cost-s3-storage-opti...
about 7 years ago in Storage Protect Family / Spectrum Protect (Server) 1 Not under consideration

Proof of Tape encryption

Since IBM made the decision to remove encryption from TSM4VE backups, we were forced to enable physical tape encryption for client data. There is currently no means to verify that a physical volume has been encrypted. The only method within Spectr...
about 5 years ago in Storage Protect Family / Spectrum Protect (Server) 2 Future consideration

TSM Snapdiff backup and usage of Snapdiffchangelog in Stagingdirectory

First concerns is with the stagingdirectory itself. In documentation for BA client (7.1.3) is the following statement:"The stagingdirectory option defines the location where the client can keep anydata that it generates to perform its operations. ...
almost 8 years ago in Storage Protect Family / TSM for System Back-up and Recovery 0 Not under consideration

Summary Report

Need a dashboard style report showing key performance figures for management. Current reports are PDFs containing long lists of information. There is no equivalent of the ‘General Operations' report that is produced by Operations Center for Spectr...
about 5 years ago in Storage Protect Family / IBM Spectrum Protect Plus 1 Planned for future release

Backup SLA hung

More generic job timeout option if for any reason a database/VM backup would hold the entire job
almost 3 years ago in Storage Protect Family / IBM Spectrum Protect Plus 1 Future consideration

Unprotected VMs View

At present it is quite hard to answer the question ‘what am I not backing up'. SPP displays a summary of this on the home page (Source Protection) and the Policy Overview page. On neither of these can I just click on the number shown and see a lis...
about 5 years ago in Storage Protect Family / IBM Spectrum Protect Plus 1 Future consideration