PROBLEM: The money behind space military activity is large, fast-moving, and hard to compare. The US Space Force FY2025 budget request was $29.4 billion (down $0.6 billion from the $30.0 billion FY2024 request), inside a Department of the Air Force request of $217.5 billion; NASA's FY2025 request was $25.4 billion with $7.8 billion for Artemis; NASA is projected to spend $93 billion on Artemis up to FY2025 at $4.1 billion per SLS/Orion launch; NASA faced almost $5 billion less funding over FY2024–FY2025; and a single debris-removal object costs €86 million against a debris field of about 40,000 tracked objects. No system holds these figures together with their sources and dates, so each figure is quoted without its context.
SOLUTION: A financial-pressure transparency data system: each sourced figure (budget request, programme cost, per-launch cost, funding squeeze, removal cost, debris scale) stored with its source and date, so the financial pressure on space military governance is visible as a dated, sourced dataset rather than as isolated numbers. A transparency and governance data system only; no figure is estimated and no wealth claim is made.
EVIDENCE BASIS: DOCUMENTED — US Space Force FY2025 request $29.4 billion, down $0.6 billion from FY2024 $30.0 billion; breakdown $18.7 billion RDT&E, $5.2 billion operations and maintenance, $4.3 billion procurement, $1.2 billion military personnel; DAF total $217.5 billion (P01, DAF FY2025 Posture Statement / CRS IF12610, March 2024); missile-warning and resilience funding $4.7 billion proliferated multi-orbit missile-warning architecture, $6.2 billion commercial launches and resilient data network, $4.4 billion satellite communications / space superiority (P02, March 2024); NASA FY2025 request $25.4 billion, $7.8 billion Artemis (P03, NASA release 24-037, 11 March 2024); Artemis $93 billion through FY2025, $4.1 billion per SLS/Orion launch (P04, NASA OIG IG-22-003, 15 November 2021); NASA almost $5 billion less over FY2024–FY2025 (P05, Administrator Nelson testimony, 23 May 2024); ClearSpace-1 €86 million for one object (P06, ESA 1 December 2020); about 40,000 tracked objects, about 11,000 active payloads, over 1.2 million objects larger than 1 cm, 2024 fragmentation events added at least 3,000 tracked objects (P07, ESA Space Environment Report 2025, 1 April 2025). REPORTED (labeled, not settled fact) — the US Space Force FY2025 request was "substantially shaped by the 2023 Fiscal Responsibility Act," which capped the Defense Department at a 1 percent increase from FY2024 funding levels (R07, Air Force Times 11 March 2024; National Defense Magazine 11 April 2024). No FY2026 figure is stated (H03, held out); no global debris-cost figure is stated (H02, held out).