Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 1617

add affected storage system / path for the message IWNR1963W

The message IWNR1963W is: One or more logical paths between storage systems have entered an error state or have been removed. Sometime there are micro network issue that makes the path have a punctual error. As we have several storage system in ou...
1 day ago in IBM Copy Services Manager (CSM) 0 Future consideration

add option for the tgtread status

We are using CSM on open system to manage zOS LPAR. When we create replication, the option tgtread is at yes with CSM, which is not compatible with zOS. Can you add a checkbox to manage this option?
2 days ago in IBM Copy Services Manager (CSM) 1 Future consideration

Support for the recognition of cascaded FlashCopy volumes

If a target volume of an existing FlashCopy relationship is used with FCM as source volumes (Cascaded FlashCopy), the FlashCopy relationship is established, but is not displayed in the report as an existing FlashCopy relationship. Even a Verfiy wi...
7 days ago in IBM Copy Services Manager (CSM) 0 Future consideration

Prevent TERMINATE of practice disks if a volume is online

In a session with practice disks, can you add an option to prevent TERMINATE if at least one of the practice disks is online please ?
28 days ago in IBM Copy Services Manager (CSM) 0 Future consideration

allow a time offset in the passticket generation

Necessary if CSM is managing across time zones
about 1 month ago in IBM Copy Services Manager (CSM) 0 Future consideration

ESEsizer - Enhance error handling conditions around communication timeouts caused by network drops

It would seem that the ESEsizer tool requires network connectivity for a long duration when collecting stats from the DS8900. Unfortunately, when there are network dropouts - the whole ESEsizer session is ruined, and you need to start again - whic...
about 1 month ago in IBM Copy Services Manager (CSM) 0 Future consideration

REST-API request for managing certificates

The creation, renewal and deletion of server certificates on devices is a manual process that has to be done through the GUI. The management of this can be a lot when dealing with multiple machines and requires a reboot. In the future if, for comp...
about 2 months ago in IBM TS4500 Tape Library 0 Future consideration

Encryption on Metro/Global Mirror Link (FCP/PPRC)

It is currently an audit exposure if data is encrypted only at a rest. Clients are required to encrypt data in all physical media where the data transits and is stored, from the CPU to disk, and also from primary copy to all other copies where it ...
about 2 months ago in IBM DS8000 0 Future consideration

More email options from Operations Center such as To, CC and BCC

Currently Operations Center is sending emails thru the BCC option and no way to make it send using the To or CC email options. It is very helpful in a colaborative environment to know where these emails go and who should be contacted so BCC will s...
about 2 months ago in Storage Protect Family / Spectrum Protect (Operations Center) 1 Future consideration

IBM CDM should be able to work with more than one Network Card to perform backup and restore operations

Customer has hosts and storage subsystems placed in distinct networks. We configured a second NIC in the CDM server but once this interface comes UP, all scheduled backup fails, the reason is that they can't find the target hosts, I wonder some ro...
about 2 months ago in Storage Protect Family / Product functionality 1 Future consideration