Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Spectrum Virtualize / FlashSystem

Showing 691

Easy Tier migration plan customizable time interval

Easy Tier migration plans are now created each 24 hour. Provide a customization option to allow shorter intervals.
over 9 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Replication: enable TCP Window Scaling

Based on information in the PMR and simulations it appears that the replication is using a fixed TCP Window size. Please consider enabling TCP Window Scaling to allow bigger transfers speeds.
over 9 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

vdisk mirror is out of sync

When a vdisk mirror is out of sync, the CLI currently does not exhibit a field to display precisely which copy of the vdisk mirror is in use. The active copy is implied when the copy is sync=true and primary=yes or when the sync=no and primary=no....
over 9 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Show SCSI ID (LUN) in View Volume by Host

In the "Volumes by Host" View is a column missing to show the SCSI ID or LUN Number which is assigned to the vdisk by the specific host.
over 9 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Supports Key Wrapping over KMIP Protocol

Key wrapping is a cryptographic algorithm which aims to provide “privacy and integrity protection for specialized data such as cryptographic keys. KMIP Protocol currently supports the Key Wrapping functionality but IBM Storwize V7000 do not suppor...
over 6 years ago in IBM Spectrum Virtualize / FlashSystem 2 Not under consideration

randam/sequential performance stats in SVC performance data

randam/sequential performance stats in SVC performance data
almost 10 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

vDisk Protection in a DTA Snapshot environment

With vdisk_protection_time and vdisk_protection_enabled, two parameters are provided in SVC and Storwize to prevent accidental deletion of a disc. Unfortunately, this function is unusable if additional products dynamically create and delete vDisk....
over 6 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Enable/disable EasyTier for a volume in the GUI

Currently the Easy Tier setting for a volume cannot be changed in the SVC GUI. A function should be added to the properties panel of a volume.
about 13 years ago in IBM Spectrum Virtualize / FlashSystem 2 Not under consideration

Increase the maximum number of partnerships between the local and remote SVC/V7/V9

Client has a V7 and (2) V9s that replicate to a single V7 in DR. They need to add an additional V9 in prod and want to replicate it to the same V7 in DR. To accomplish this Client needs IBM to increase the maximum number of partnerships between th...
over 6 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration

SVC custom alerting

Customer would like to change the error code 1187 to a higher severity than warning. Warning would not generate an email to let them know that they have a node down. Alternatively would like to change alerting on individual error codes.
about 10 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration