Skip to Main Content
IBM System Storage Ideas Portal


This portal is to open public enhancement requests against IBM System Storage products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Spectrum Virtualize / FlashSystem

Showing 691

Show command that will be executed via GUI before confirmation

IBM Flashsystem GUI has a nice feature that shows what cli command was executed in the backend for selected options. It would be much better to show what will be executed before confirmation.
about 1 year ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Minimize Upgrade time for Flash System canisters

Today upgrade of Flash System controller take around 20 minutes per canister.This means less performance , less ports that are in use , and put the customer in risk , in case the second canister have problem during the upgrade of the first canister.
about 1 year ago in IBM Spectrum Virtualize / FlashSystem 0 Future consideration

V8.4.0.5 Remote Copy GUI need to show all consistency groups and their freeze times on first screen.

V8.4.0.5 Remote Copy needs to show all consistency groups and their freeze times on first screen. V8.4.0.5 Remote Copy GUI now takes 16 keystrokes to view 7 consistency group freeze times. It takes 3 keystrokes to view one consistency group freeze...
almost 3 years ago in IBM Spectrum Virtualize / FlashSystem 8 Future consideration

Allow more authentication services for multitenancy

Currently only one authentication services can be defined in Spectrum Virtualize systems. Although the storage allowes more authentication servers to be registered, but that for reliability (availability) reasons. (same domain) The goal is to achi...
about 1 year ago in IBM Spectrum Virtualize / FlashSystem 1 Future consideration

Deliver Spectrum Connect as container image (Docker)

Customers are very considered by the demand for root access to install Spectrum Connect. At some customers its impossible to get around this demand.One way around it would be to deliver a Dicker image of the product.
over 5 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Implement Hyperswap cluster health status on GUI

In the Hyperswap demo from TechZone linked below, there is an HTML based "Demonstration Web interface" which is used to pilot the demonstration from a single point: https://techzone.ibm.com/collection/MOP-FLASH-HYPERSWAP-VMWARE_TECH It also visual...
almost 2 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

Commands in FS7200 CLI needs more verbosity levels

In troubleshooting connections and logins, ie inside DNS, LDAP, Proxy, Call Home tests then cli does not give enough information. All the time snaps are needed and then look into those to troubleshoot.
almost 3 years ago in IBM Spectrum Virtualize / FlashSystem 2 Future consideration

SVC Easy Tier - Heat Map Transfer Request

Given that SVC is used for DR, and with 7.3.x Easy Tier allows 3 tiers, just like in the DS8K series, it is critical for customers to be able to have the Heat Map Transfer for the SVC to ensure efficient transition to a DR center during a disaster...
about 10 years ago in IBM Spectrum Virtualize / FlashSystem 1 Not under consideration

How to gracefully stop the IP quorum application on host

Customer raised question :" how to gracefully stop the quorum application and shut that RHEL server down." Presently , we don't have stop command - hence we have to be dependent on host shutdown It will be good idea to add this new functionality "...
10 months ago in IBM Spectrum Virtualize / FlashSystem 0 Under review

SCSI UNMAP on pool level enable/ disable

Enabling/disabling backend SCSI UNMAP on pool level.
over 3 years ago in IBM Spectrum Virtualize / FlashSystem 0 Not under consideration